Our Projects

Take A Look At Our Works Done Over The Years

Contracted Work:

Roadworks

Contracted Work:

Drain Work

Contracted Work:

Demolition

Contracted Work:

Reinforced Concrete Structure

Contracted Work:

Site Setup

List Of Projects Completed

Year

Month

Contracted Work

Project Name

2024

August

Addition and Alteration of the new chemical store construction of fire rated wall, RC Ramp & fencing

A & A works at Chevron at 210 Jalan Buroh

2024

January

Temporary Work & Precast Yard Setup

Obayashi - Singtel DC

2023

December

Retaining wall (Part 2)

Contract CR108 - Retaining wall (Pt 2)

2023

November

ECM

Proposed A&A and change of use to exiting 5 storeys building at Kim Yan Road

2023

November

External Works

Proposed Erection of 2 Blks of 5 Storey Educational Bldg to existing International School on Lot 03643N Mukim 19

2023

July

RC Works (Basement)

Proposed New Erection of 39-Storey Residential Condominium Development comprising of 36-Storey Residential Tower Blk, 2 Sky Terraces, 1 Landscape deck, 3 Basement Carpark

2023

July

Road Resurfacing and Drain works

Contract CAFHI 2023-10 – Road Resurfacing and Drain regarding works at Tank Farm 1 near to the main entrance

2023

April

RC Works

Proposed 2 Storey Envelope Control Detached House With Basement, Attic And Swimming Pool

2023

March

Guard House & Trial Hole

Pfizer Plant - Guard House & Trial Hole

2023

March

Hoarding & RC Works

Contract Cr101 - Hoarding & Rc Works

2023

March

Hoarding & Site Entrance

Contract Cr110 - Hoarding & Site Entrance

2022

July

Automatic Wheel Wash Bay

Contract Cr108 - Automatic Wheel Wash Bay

2022

July

Road Works

A&A Works To Single Story Factory At Amk Industrial Park 2

2022

July

Demolition of Mag21

Contract T235 - Construction Of Viaduct And Tunnels For Rapid Transit System (Rts) Link

2022

July

Site Clearance for Remaining Works

Jurong Regional Line J108 - Design & Construction Of Tengah Plantation Station, Tengah Park Station, Bukit Batok West Station And Viaduct

2022

January

Supply Labour & Machinery to Reinstate TOL at Kian Teck

Lot 01189A, 0484V, 01191L Mukim 06 At Sunview Drive / Sunview Way

2021

October

Noise Barrier Footing Construction

Jurong Regional Line J108 - Design & Construction Of Tengah Plantation Station, Tengah Park Station, Bukit Batok West Station And Viaduct

2021

October

Demolition of Over Run Tunnel

Contract T235 - Construction Of Viaduct And Tunnels For Rapid Transit System (Rts) Link

2021

September

Temporary Works

Jurong Regional Line J108 - Design & Construction Of Tengah Plantation Station, Tengah Park Station, Bukit Batok West Station And Viaduct

2021

August

Site Development Works

Crisp - Proposed Erection Of Workers Accommodation Camp For The Chemical And Refining Intergrated Singapore

2021

August

Supply, Labour & Equipment for Reinforced Concrete (RC) and External Woks

Proposed Erection Of Single-Storey Engineering Building 3 With Ancillary Office Within Developments On Lot 04347V Mk07 At 11 Tuas South Avenue 12 (Tuas Planning Area) Eb3) (Hct-Eb3)

2021

June

Precast Yard Setup

Jurong Regional Line J108 - Design & Construction Of Tengah Plantation Station, Tengah Park Station, Bukit Batok West Station And Viaduct

2021

March

IC/Sump Work

Proposed New Erection Of 11 Sty Data Centre On Lot No. 011896, 04841V, 01191L Mukim 06 At Sunview Avenue / Way

2021

February

Site Clearance for Site Office Area, Supply and Installation of Hoarding and Gates. Relocation and Reinstatement of Community Cacilities

Jurong Regional Line J108 - Design & Construction Of Tengah Plantation Station, Tengah Park Station, Bukit Batok West Station And Viaduct

2021

January

Temporary Site Access Work

Temp Site Access For Project Sga (Facebook Date Centre)

2020

December

Hydrant Pipeline

Proposed Constructing Of Reinforcement For The Protection Of East Hydrant Pipeline At Cafhi

2020

December

Temporary Work

Site Setup For Tol (Precast Yard)

2020

August

Site Establishment Works

Proposed Erection Of 2 Blks Of 5-Sty Multi-User Data Centres (Total 16 Units) & 1 Blk Of 4-Sty 66Kv Substation With Ug Fuel Storage Tanks On Lot 04958K Pt Mk31 At Loyang Drive – Phase 2 Bldg C&D And 66Kv Substation (At_Sgp1 P2)

2020

July

Temporary Perimeter Hoarding Work

5M Height Hoarding For Proposed Condo

2020

March

Seepage Tank

Contract T208 – Construction Of Springleaf Station And Associated Tunnels For Thomson Line

2020

February

External Works & Panel Widening

Proposed 20 Storey Hotel (Artyzen) @ Cuscaden Road

2020

February

Substation

Micron - C60B-3 - 230Kv Substation

2020

February

Site Establishment Works

Micron Fab 10 - S01A

2019

October

Site Development Works

Contract - C1A Tuas Water Reclamation Plant

2019

August

Excavation and A&A Works

Proposed Excavation Work To Existing 7-Storey Single User Industrial Development & Disposal At 7 Tai Seng Drive (Equinex Data Centre Sg4)

2019

August

Traffic Diversion Phase 2 & Final Reinstatement Works

Lots 6991M & 7373T Mk23 At Paya Lebar Road/Sims Avenue For The Paya Lebar Central, Singapore

2019

April

Site Establishment Works

Wyeth Fast Project - S01

2019

February

External Works

Alexandra Technopark @ Alexandra Road

2019

February

Site Establishment Works

Micron Fab 10 - 230Kv Substation - S01

2019

January

Provision of Services for Road Widening Works

Bp Project At 10 Jalan Tepong

2018

December

Road Widening Work

Temporary Site Office Set Up And Tr27 18M Lta Road

2018

December

In-situ Reinforced Concrete Works

Tuas Bridge Project

2018

December

Site Clearance & Road Works

Design & Build Road Access At Tuas View Basin

2018

October

Supply & Install Temporary Works & Excavation, Disposal & Backfillings Work, External Works & Reinstatement Works

Crater Lake @ Pasir Panjang

2018

September

Reinstatement of 450mm Wide Drain at Egress Lane T1 West

Jewel Changi Airport

2018

August

Additional Shed & Loading Bay

Kyodo Yushi @ 3 Gul Crescent

2018

August

Earthworks & External Works. Temporary Works including Tree Felling

Alexandra Technopark @ Alexandra Road

2018

June

Culvert Drain Diversion & Demolition Work

T219 Orchard Station

2018

April

External Reinstatement Works

Criterion Yishun Avenue 1/Yishun Street 51

2018

March

Earthworks & RC Works & Temporary Site Access

Paya Lebar Quarter @ Paya Lebar Road - Plot A

2018

February

Site Establishment Works

Micron Fab 10 - S01B

2018

February

Temporary Site Set Up

Gsk Bio - Temporary Site Set Up @ Tuas South Avenue 8

2018

January

Site Establishment Works

Greenfield @ Tuas South Avenue 14 - S01 (Mundipharma)

2019

October

Site Development Works

Contract - C1A Tuas Water Reclamation Plant